The GSJ is almost finished. This was taken at 10am this morning. Going out visiting has stopped final stringing up, testing and setting up (still out ATM).
I’m going to finesse the pickguard shape and make a 3-ply truss rod cover as the 1-ply black one is a bit uninteresting. The finish is OK, not perfect, a few small flaws but not bad.