I'm building an AIB-1Q kit and am confused about the bridge. It's a hardtail with what seems to be holes for string through or top load.
![]()
I'm reluctant to drill string through holes on this one (body is slightly contoured and I've never done string through before- I'll save my first attempt for a flat bodied tele or something) and I'm perfectly happy to do top loading.
Is this bridge top load compatible?