First clear coat went onto the body this morning. It's time to start getting the wiring done...
I'll begin by wiring up the pots and the switch... then when I am at my father-in-law's place tomorrow I will check the pickups with a multimeter and see if there is a "neck and bridge", or just two identical pickups.
I suspect the pickups will be the second thing to get swapped out if it turns out nice.
First will be the vibrato, though that will mean expanding the route... I'll probably need to find a friend more capable of doing it, heh.
Last edited by tommycarlos; 27-12-2017 at 07:12 AM.