Page 6 of 8 FirstFirst ... 4 5 6 7 8 LastLast
Results 51 to 60 of 74

Thread: Rob's JB-5RF

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Member ThreeBbass's Avatar
    Join Date
    Jul 2016
    Location
    Baulkham Hills area, Sydney
    Posts
    103

    Control Route

    Another day well spent!

    Started off by filling a couple of minor glitches around the scratchplate and created the space for the control plate ...
    Click image for larger version. 

Name:	controlroute01.jpg 
Views:	239 
Size:	199.7 KB 
ID:	14428

    Control plate fits OK ... little bit of sanding work required to tidy it up, but looking good.
    Click image for larger version. 

Name:	controlroute02.jpg 
Views:	282 
Size:	190.2 KB 
ID:	14429


  2. #2
    Member ThreeBbass's Avatar
    Join Date
    Jul 2016
    Location
    Baulkham Hills area, Sydney
    Posts
    103

    DT Colourless finish begins!

    I gave the body another good sand with some 400 grade paper and then applied the DT colourless stain coat.
    I think it's going to work well ...
    Click image for larger version. 

Name:	bodystain01.jpg 
Views:	253 
Size:	124.6 KB 
ID:	14430 Click image for larger version. 

Name:	bodystain02.jpg 
Views:	258 
Size:	197.1 KB 
ID:	14431

    now the waiting before the intensifier coat begins ...

  3. #3
    GAStronomist wazkelly's Avatar
    Join Date
    Aug 2015
    Location
    Caloundra West, Sunshine Coast Qld
    Posts
    6,631
    Wow, looks even better than what I had imagined.
    # 1 - EX-5 https://goo.gl/fQJMqh
    # 2 - EX-1 https://goo.gl/KSY9W9
    # 3 - Non PBG Tele https://goo.gl/W14G5g
    # 4 - Non PBG J Bass https://goo.gl/FbBaFy
    # 5 - TL-1AR GOTM Aug 2017 https://goo.gl/sUh14s
    # 6 - MMB-4 Runner-up GOTM Oct 2018https://goo.gl/gvrPkp
    # 7 - ES-1 Runner-up GOTM Aug 2018https://goo.gl/T9BEY8

  4. Liked by: ThreeBbass

  5. #4
    GAStronomist FrankenWashie's Avatar
    Join Date
    Jan 2016
    Location
    Glebe, NSW
    Posts
    5,666
    Super-Schmick work 3B!
    FrankenLab
    Hand crafting guitars, because Death Rays are expensive.


  6. Liked by: ThreeBbass

  7. #5
    GAStronomist stan's Avatar
    Join Date
    Aug 2013
    Location
    Geelong, Vic
    Posts
    5,290
    great build, nice work, awesome attention to detail

  8. #6
    Member ThreeBbass's Avatar
    Join Date
    Jul 2016
    Location
    Baulkham Hills area, Sydney
    Posts
    103
    Put a final coat on and now waiting for it to cure before doing the next one ...
    Click image for larger version. 

Name:	finalcoat02.jpg 
Views:	228 
Size:	268.1 KB 
ID:	14577

    Click image for larger version. 

Name:	finalcoat01.jpg 
Views:	225 
Size:	350.8 KB 
ID:	14578

    I'm really happy with the way this is turning out ...
    The only problem with this stage of the build is the patience required!

    Wondering if there's an 'optimal' number of finish coats to put on?
    Any suggestions would be welcome!!

  9. #7
    Overlord of Music Andy40's Avatar
    Join Date
    Oct 2015
    Posts
    3,913
    Not sure if I like the guitar more or your back deck!...great pickguard mate.
    Build #1 - ST-1 - Completed
    Build #2 - LP-1SS - Completed
    Build #3 - TLA-1R - Completed
    Build #4 - SGD-612 - Completed
    Build #5 - ES-1G - Completed
    Build #6 - STA-1HT | Completed
    Build #7 - ST1JR - Completed
    Current Build #8 - JBA-4
    Build #9 - Semi-scratch build Tele x 2 - Completed
    Current Build #10 - PRS-1H
    Current Build #11 - AGJR-1 - Completed
    Current Build #12 - ATL-1SB
    Current Build #13 - GST-1
    Current Build #14 - FBM-1

  10. #8
    GAStronomist wazkelly's Avatar
    Join Date
    Aug 2015
    Location
    Caloundra West, Sunshine Coast Qld
    Posts
    6,631
    Looking good.

    Andy seems to be best person to ask about DT but from my own experience best to think about stopping when you have done 5 coats or less if it looks done.
    # 1 - EX-5 https://goo.gl/fQJMqh
    # 2 - EX-1 https://goo.gl/KSY9W9
    # 3 - Non PBG Tele https://goo.gl/W14G5g
    # 4 - Non PBG J Bass https://goo.gl/FbBaFy
    # 5 - TL-1AR GOTM Aug 2017 https://goo.gl/sUh14s
    # 6 - MMB-4 Runner-up GOTM Oct 2018https://goo.gl/gvrPkp
    # 7 - ES-1 Runner-up GOTM Aug 2018https://goo.gl/T9BEY8

  11. #9
    Overlord of Music Andy40's Avatar
    Join Date
    Oct 2015
    Posts
    3,913
    Re finish coats.

    You have to be a bit careful here. put too many on too quickly (for the weather) and it may turn out like H's TLQ ...doesn't really seem to cure. Not that I thought H did anything wrong.

    Pretty sure DB would have stopped at 3, I would go to 9 just because i like to cut it back a bit after curing with some 2000 wet and dry then polish.

    Regrettably, the only way to tell is wait then try, if you cut it back too much, as I have done (twice), you end up sanding into the intensifying coat and many swear words depart from ones mouth. Then you start again.
    Build #1 - ST-1 - Completed
    Build #2 - LP-1SS - Completed
    Build #3 - TLA-1R - Completed
    Build #4 - SGD-612 - Completed
    Build #5 - ES-1G - Completed
    Build #6 - STA-1HT | Completed
    Build #7 - ST1JR - Completed
    Current Build #8 - JBA-4
    Build #9 - Semi-scratch build Tele x 2 - Completed
    Current Build #10 - PRS-1H
    Current Build #11 - AGJR-1 - Completed
    Current Build #12 - ATL-1SB
    Current Build #13 - GST-1
    Current Build #14 - FBM-1

  12. #10
    Member ThreeBbass's Avatar
    Join Date
    Jul 2016
    Location
    Baulkham Hills area, Sydney
    Posts
    103
    Thanks for the advice Andy ... very helpful.
    Not sure if I have the patience to wait for 9 coats to cure ... in the tutorial vid DB says he likes to leave each coat for a week between layers!

    I think I'll be keeping the swear-jar on standby ...

Page 6 of 8 FirstFirst ... 4 5 6 7 8 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •