Results 1 to 10 of 80

Thread: DTL-1SB First build

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #10
    Member
    Join Date
    Oct 2021
    Location
    Sydney
    Posts
    34

    Checking the controls fit and all the bits are in the box

    The checking continues so I have another few questions please before I begin.


    1. The pots with 2 x 2 different nuts and washers. I assume the washer goes over the pickguard then the smaller nut then tightens down before adding the control knobs. But where does the bigger loose fitting nut go? Between pickguard and pot?

    2. To attach the 3 way switch should I be using the wood screw in picture - all the after market switches seem to have machine screw?

    3. Finaly should I stick with the pic guard on my first build I can get it aligned with the bridge, neck pup and control cavities with only a small shave off the LHS of where it sits next to the neck circled - any traps with this approach?


    Thanks again

    Click image for larger version. 

Name:	Neck trim.jpg 
Views:	849 
Size:	64.9 KB 
ID:	42204 Click image for larger version. 

Name:	Control fit.jpg 
Views:	830 
Size:	55.1 KB 
ID:	42205
    Last edited by DeanCraig; 28-12-2021 at 06:43 PM.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •