Results 1 to 10 of 96

Thread: First Build - AES-1 AHAHAHAHA

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    GAStronomist Simon Barden's Avatar
    Join Date
    Oct 2016
    Location
    Reading, UK
    Posts
    10,547
    You can easily fit (and remove) the two E tuners (you don't need any more that that to check alignment), just don't drill the hole for the anti-rotation screw yet. The tuners screw in place from the top, so doing the nuts up reasonably tight will keep them in place well enough to run some string between the headstock and the bridge.

  2. #2
    Member
    Join Date
    Mar 2018
    Location
    UK
    Posts
    49
    Quote Originally Posted by Simon Barden View Post
    You can easily fit (and remove) the two E tuners (you don't need any more that that to check alignment), just don't drill the hole for the anti-rotation screw yet. The tuners screw in place from the top, so doing the nuts up reasonably tight will keep them in place well enough to run some string between the headstock and the bridge.
    Haha as soon as I read this I realised I knew that!!! I think I’m getting a little nervous about starting and over thinking everything! Thanks for your patience though!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •