Results 1 to 10 of 66

Thread: Build Diary of an MMB-5

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #11
    Member RalphH's Avatar
    Join Date
    Jul 2017
    Location
    Orewa, New Zealand
    Posts
    71
    Quote Originally Posted by wazkelly View Post
    Hi Ralph, I am only 6 or 7 coats into the Tru Oil top coats with another 12 - 15 to do so that it builds up enough depth for intermittent wet sanding and ultimate final polish. When that has all been done I usually wire things up and then string it all together. With fairly cool weather here at present best to leave things a bit longer to fully cure and reckon that might be 4 - 6 weeks away. Probably not as cold here as over the ditch just north of Auckland?
    Yep, been quite wet and consequently humid here for the drying of finishes in a reasonable time. If this keeps up when I get round to painting, I may try the idea shown here where a cheapie portable greenhouse has been re-purposed as a drying booth. Just stick a 20W wardrobe heater or some Damp-Rid it the bottom and that will speed up your curing times...
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	guitar-dryer.jpg 
Views:	136 
Size:	125.5 KB 
ID:	21498  

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •