Hey just looking for a little advice regarding the mock build. I'm wondering how to secure the bridge without drilling or if I need to. The little issue I'm having in my head is because its a 12 string, I'll need to use the 2 different types of entry (ferrule and behind the bridge) to check the string spacing against the edge and how straight everything is. Is the string through the ferrule enough to hold the bridge in place? If so I assume the answer is to just put both octave strings on both sides so its held down by the ferruled strings, but I just want to make sure.