nice one Rob, think DB will give you at least 2 months in the naughty room with those products hahah
Think I'd delay the staining if it was above 40 degrees, sit down and pour a cold beer instead in the aircon !
nice one Rob, think DB will give you at least 2 months in the naughty room with those products hahah
Think I'd delay the staining if it was above 40 degrees, sit down and pour a cold beer instead in the aircon !
Current Builds and status
scratch end grain pine tele - first clear coat on !
JBA-4 - assembled - final tweaks
Telemonster double scale tele - finish tobacco burst on body and sand neck
Completed builds
scratch oak.rose gum Jazzmaster - assembled needs setup
MK-2 Mosrite - assembled - play in
Ash tele with Baritone neck - neck pup wiring tweaks and play in