Results 1 to 7 of 7

Thread: Precision Bass wiring

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    GAStronomist Simon Barden's Avatar
    Join Date
    Oct 2016
    Location
    Reading, UK
    Posts
    10,547
    Make a fair length of bare wire and just sit the bridge on it. If you use a fairly thin bit of wire for the ground wire here, you can probably knot it first, so that the knot sits in the vertical hole you drilled first, which then stops the wire from being pulled too far into the cavity. Just have the exposed wire sitting on the body and you can spread the strands out so that it doesn't add any real thickness.

  2. #2
    Moderator fender3x's Avatar
    Join Date
    Jan 2016
    Location
    Miami, FL, USA
    Posts
    2,805
    Quote Originally Posted by Simon Barden View Post
    "you can probably knot it first, so that the knot sits in the vertical hole you drilled first, which then stops the wire from being pulled too far into the cavity."
    That is such a good idea, and yet I have never heard it suggested before, and I certainly never thought of it...



    Sent from my ONEPLUS A3000 using Tapatalk

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •