Slow progress. Drilled the neck this morning before the kids decoded to take over lolthe
Unfortunately the rest of the day will likely be spent repairing my air con, but I hope to get the bridge placement done tonight
Slow progress. Drilled the neck this morning before the kids decoded to take over lolthe
Unfortunately the rest of the day will likely be spent repairing my air con, but I hope to get the bridge placement done tonight
Bridge placement done. Pickup cavity needs adjusting which I expected.
Next up is the string through holes and rear ferrules
Looking great!
How's the string height / action ?
Pretty good out of the box actually. I don't anticipate needing to shim or alter the neck pocket depth.
On to the string ferrules
Drill the top first
Add my table with 4mm pop rivet.. Line the drill up with the centre of the rivet. Body then goes face down and each string through hole drops over the rivet.
Result is perfect ferrules
Sent from my iPhone using Tapatalk
Yeah man, great job, this ain't an easy task. I can see practice makes perfect. I practiced mine about 5 times before drilling.
Build #1 - ST-1 - Completed
Build #2 - LP-1SS - Completed
Build #3 - TLA-1R - Completed
Build #4 - SGD-612 - Completed
Build #5 - ES-1G - Completed
Build #6 - STA-1HT | Completed
Build #7 - ST1JR - Completed
Current Build #8 - JBA-4
Build #9 - Semi-scratch build Tele x 2 - Completed
Current Build #10 - PRS-1H
Current Build #11 - AGJR-1 - Completed
Current Build #12 - ATL-1SB
Current Build #13 - GST-1
Current Build #14 - FBM-1
Slow going this week. Managed to get the rough headstock shape done today and carved the rear headstock transitions a bit better.![]()