Page 4 of 7 FirstFirst ... 2 3 4 5 6 ... LastLast
Results 31 to 40 of 63

Thread: ES-1TL Build by MrMayhem Thread

  1. #31
    GAStronomist stan's Avatar
    Join Date
    Aug 2013
    Location
    Geelong, Vic
    Posts
    5,290
    sounds like a cool plan, look forward to more pics

  2. #32
    Member
    Join Date
    Aug 2016
    Location
    Kent, Ohio
    Posts
    47
    Well, Plan C looks like a failure. I may have to go with the trapeze set up anyway. I can't find a stop tail that is 74mm at the studs.

  3. #33
    Overlord of Music
    Join Date
    Aug 2012
    Location
    Brisvegas
    Posts
    3,356
    'As long as there's, you know, sex and drugs, I can do without the rock and roll.'

  4. #34
    Member
    Join Date
    Aug 2016
    Location
    Kent, Ohio
    Posts
    47
    Quote Originally Posted by pablopepper View Post
    Yeah, That's it. I'm kind of hesitant to order from Germany for the $100+ US that it costs, and risk it not fitting. I really need a more affordable option if it's out there, my budget on this project is stretched as it is.

  5. #35
    Overlord of Music
    Join Date
    Aug 2012
    Location
    Brisvegas
    Posts
    3,356
    Those prices include European taxes which you can subtract. I figured the chrome one would cost $49usd before shipping, but I totally understand, it's very easy to get carried away and spend way too much on these things.
    'As long as there's, you know, sex and drugs, I can do without the rock and roll.'

  6. #36
    Overlord of Music Dedman's Avatar
    Join Date
    Mar 2016
    Location
    The "Fabulous" Gold Coast
    Posts
    3,566
    could you fill the stud holes and redrill them at 82mm and use a gotoh wrap over like this, it would probably hide the old holes as it has a fair bit of overhang
    Click image for larger version. 

Name:	gt510ub-0021.jpg 
Views:	173 
Size:	19.8 KB 
ID:	14163
    Build 19 PSH-1 Kustom
    Build 18 HB-4S Kustom
    Build 17 WL-1 Kustom
    Build 16 TL-1TB Kustom
    Build 15 PBG-2-
    Build 14 FTD-1
    Build 13 RD-1 Kustom
    Build 12 DM-1S
    Build 11 MKA-2 -
    Build 10 Basic strat
    Build 9 JM Kustom
    Build 8 FV-1G
    Build 7 ES-2V
    Build 6- Community prototype
    Build 5 LP-1LQ
    Build 4 ES-5V
    Build 3 JR-1
    Build 2 GD-1
    Build 1 TLA-1

  7. #37
    Member
    Join Date
    Aug 2016
    Location
    Kent, Ohio
    Posts
    47
    $49 US? That's not terrible. I guess it depends on the shipping cost. I might be able to chew that.

  8. #38
    Member
    Join Date
    Aug 2016
    Location
    Kent, Ohio
    Posts
    47
    Quote Originally Posted by Dedman View Post
    could you fill the stud holes and redrill them at 82mm and use a gotoh wrap over like this, it would probably hide the old holes as it has a fair bit of overhang
    Click image for larger version. 

Name:	gt510ub-0021.jpg 
Views:	173 
Size:	19.8 KB 
ID:	14163
    I thought about that, but being a seni-hollow, the wood underneath isn't wide enough to fill and drill, and the paint is done.....

  9. #39
    Overlord of Music Dedman's Avatar
    Join Date
    Mar 2016
    Location
    The "Fabulous" Gold Coast
    Posts
    3,566
    I see a Duesenburg bridge in your future :/
    Build 19 PSH-1 Kustom
    Build 18 HB-4S Kustom
    Build 17 WL-1 Kustom
    Build 16 TL-1TB Kustom
    Build 15 PBG-2-
    Build 14 FTD-1
    Build 13 RD-1 Kustom
    Build 12 DM-1S
    Build 11 MKA-2 -
    Build 10 Basic strat
    Build 9 JM Kustom
    Build 8 FV-1G
    Build 7 ES-2V
    Build 6- Community prototype
    Build 5 LP-1LQ
    Build 4 ES-5V
    Build 3 JR-1
    Build 2 GD-1
    Build 1 TLA-1

  10. #40
    Member
    Join Date
    Aug 2016
    Location
    Kent, Ohio
    Posts
    47
    I've heard they "pull" out or bend toward the head? Any experience with that?

Page 4 of 7 FirstFirst ... 2 3 4 5 6 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •