On the SG-2 kit there was a drilled hole from the neck cavity through to the bridge PUP cavity. You can see it in the picture below.
Then there was a drilled hole from the base of the bridge pup cavity into the control cavity. And another from the Control cavity to the lower bridge stop post for the ground wire.