Here's the website address for RealParts where I ordered the new Schaller Lockmiester Floyd Rose Bridge from, if you're interested in ordering stuff from them then set up an account with them as it makes things easier:
http://www.realparts.com.au/
Here's the website address for RealParts where I ordered the new Schaller Lockmiester Floyd Rose Bridge from, if you're interested in ordering stuff from them then set up an account with them as it makes things easier:
http://www.realparts.com.au/
Yep agree, great service from these guy's!
Sent from my SM-T700 using Tapatalk
Current Projects
#Planning 5 String Bass
Just an hour or so up the road from me! I've not heard of them before, thanks Dr Nomis!
Actually Nomis, Realtone were in New Zealand originally with a different name, but branched here due to how popular it became here in Oz. I've known about the company for quite a while thanks to the Gavmeister and from what I've heard it's a fantastic company and I hope to put through an order for a build sometime soon![]()
Coolum isn't to from West islands capital city Brisbane
Tony
ive bought bits from them as well, no complaints at all
Stan's LP Build for my Sister: http://www.buildyourownguitar.com.au...ead.php?t=3146
Benson Pickup Strat mod: http://www.buildyourownguitar.com.au...ead.php?t=5229
Epiphone LP headstock fix: http://www.buildyourownguitar.com.au...ead.php?t=3410
Martin Backpacker Repair: http://www.buildyourownguitar.com.au...?t=5038&page=3
'57 Harmony Jazz guitar project: http://www.buildyourownguitar.com.au...ead.php?t=2972
Time for a quick update:
While doing a trial-fit of the new Floyd Rose Bridge on my PRS SE Custom 24 guitar, I found that I needed to replace the original Sustain Block on the Bridge with a shorter one to ensure enough clearance between the plastic cover plate for the spring-cavity and the Sustain Block, so, I have just ordered a 34mm Nickel-Plated Brass Sustain-Block from Real Tone Music that's designed for the Original Floyd Rose Bridge and Schaller Floyd Rose Bridges, I was lucky enough to be able to afford the Express Delivery postage so the new Sustain Block should arrive within two working days or so.