Build #1 - ST-1 - Completed
Build #2 - LP-1SS - Completed
Build #3 - TLA-1R - Completed
Build #4 - SGD-612 - Completed
Build #5 - ES-1G - Completed
Build #6 - STA-1HT | Completed
Build #7 - ST1JR - Completed
Current Build #8 - JBA-4
Build #9 - Semi-scratch build Tele x 2 - Completed
Current Build #10 - PRS-1H
Current Build #11 - AGJR-1 - Completed
Current Build #12 - ATL-1SB
Current Build #13 - GST-1
Current Build #14 - FBM-1
Mock build complete!
I am quite amazed with the Grovers, literally just slipped the string through and gave it a few winds and it holds in tune. Unbelievable. I was only going to put in the 1st and 6th strings to check the scale length etc. even played a few tunes
This was the easiest mock build I have had to date. Mainly because all of the holes were pre-drilled and everything lined up perfectly. Pity though as I'll be changing a few things so some of the holes will need to be filled and others drilled.
the measurements are the same as Bungees - 316mm nut to middle of the 12th. 330mm from centre of 12th to the saddles. However, I'm not worried as I'll need to change the bridge position as I'll be installing an ashtray bridge and string through, most likely Wilkinson compensated.
![]()
Build #1 - ST-1 - Completed
Build #2 - LP-1SS - Completed
Build #3 - TLA-1R - Completed
Build #4 - SGD-612 - Completed
Build #5 - ES-1G - Completed
Build #6 - STA-1HT | Completed
Build #7 - ST1JR - Completed
Current Build #8 - JBA-4
Build #9 - Semi-scratch build Tele x 2 - Completed
Current Build #10 - PRS-1H
Current Build #11 - AGJR-1 - Completed
Current Build #12 - ATL-1SB
Current Build #13 - GST-1
Current Build #14 - FBM-1