Yep, this is why I'm awaiting confirmation the TL-1 bridge plate is drilled for both top loading & string through. So I can get scale length spot on with top loading, mark through holes for string through, drill, counterbore for ferrules, with the same TL-1 bridge plate. Then remove hardware, final prep & finish.