Results 1 to 10 of 151

Thread: PSH-1 Build

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    GAStronomist Simon Barden's Avatar
    Join Date
    Oct 2016
    Location
    Reading, UK
    Posts
    10,547
    Yes, that looks fine. The nut slots are too high for a low action, but cut them lower (or sand the bottom of the nut instead) and that height will come right down.

    Looks like you'll be able to get a really nice low set-up on it (if that's your preference).

  2. #2
    Quote Originally Posted by Simon Barden View Post
    Yes, that looks fine. The nut slots are too high for a low action, but cut them lower (or sand the bottom of the nut instead) and that height will come right down.

    Looks like you'll be able to get a really nice low set-up on it (if that's your preference).
    Thanks Simon, I actually ordered a Bone nut with the kit, never swapped out a nut before so will be YouTubeing it on how to replace a nut. Will compare the two and adjust the bone nut height accordingly by sanding the bottom as suggested

    Also do you have a suggestion as to how I can mark out my neck alignment while it’s clamped down now so that when I glue it and then clamp down, I have a guide to ensure it’s the same angle. Was thinking of drawing a line either side of the neck along the section where the neck and top of the veneer meet within the pocket area?


    Sent from my iPhone using Tapatalk

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •