Crikey, it is getting busy around here with build logs.......mine was pushed to the second page haha
Spent the last few days refining the finish and started on the neck..
Headstock now finished, and front face stained.
Before I go further I will be drilling holes at work on their pillar drill
for the string ferrule/bushing thingy.
That way if I scuff the finish I can sand it down and add another coat (or two).
To do that I have had to finally mark where the bridge will be.
I do hope it is correct, no going back now.
Anyway, thinking ahead, my next task but one or two is to fit copper tape to the cavities.
Question is, how do you earth the bridge ?
Remove the insulation and trap the bare wire between the bridge and body ?
Stick some tape to the body, solder a wire to it and screw the bridge over that ?
In the real world I would solder a tag to the wire and screw that to something.
What are your preferred methods chaps ?
Cheers, FB.