DB don't you mean store the timber at least 6 months ? (you typed 6 weeks)
we're going to the wood show Saturday so might try this out DB, store the timber in the shed for 12 months.
I even got a camphor slab from 12 months ago
DB don't you mean store the timber at least 6 months ? (you typed 6 weeks)
we're going to the wood show Saturday so might try this out DB, store the timber in the shed for 12 months.
I even got a camphor slab from 12 months ago
Current Builds and status
scratch end grain pine tele - first clear coat on !
JBA-4 - assembled - final tweaks
Telemonster double scale tele - finish tobacco burst on body and sand neck
Completed builds
scratch oak.rose gum Jazzmaster - assembled needs setup
MK-2 Mosrite - assembled - play in
Ash tele with Baritone neck - neck pup wiring tweaks and play in