Quote Originally Posted by ultpanzi View Post
I'm doing a black burst with the nullabor ochre, pics are up on the thread "Custom IB-7" I'm only half way through but I've got to say its going amazing. The only qualm I have with dingotone is that it dries very slowly compared to other finishes.
Yes, the DT does dry slower than most..
I have your health and safety in mind so there are no toxic dryers added.

Also, i am hoping to instill a slow build/ finish ethos as this will always give you a far superior end product.
Typically my scratch builds take three months minimum before i call them done. Most of this time is spent on the finish!

Because i am anally retentive about my finishes i leave each coat to dry for at least a week