You do realise I was joking Bargeloobs lol
Last edited by kimball492; 26-12-2014 at 08:34 AM.
I spend longer than that looking for the screwdriver I just put down.
'As long as there's, you know, sex and drugs, I can do without the rock and roll.'
No such thing as too long. The majority of time I spend is on waiting for the finish to cure.
yeah nup, I'm not spending enough time. Too busy doing other crap to get a chance to finsh the five builds I have now. 4 Kits and a scratchy....
BWAHHHHHHH
and a binding reapir on my eagle ii
PK
the reality of the clip is that it's only seven miutes at each station. the Gits sit for a while between each, just like thay sit in my spare room waiting for me to find time. If I had the gear they have I could fit up a git in about 10 mins too. :P
Last edited by kells80aus; 24-12-2014 at 03:30 PM.
Kellza
(PK)
"Jack of all trades, Master of None"
"You'll never ever know if you don't have a go"
https://www.facebook.com/PaulWKelly
Avatar Image is a "The headstock of my first scratchy"
Excellent video Kimball. Have to say, that's a nice looking guitar in the end... and another matt finish, which seems to be the trend these days.
Cheers,
Adam
adamboyle(at)pitbullguitars.com