-
I tried it once. didn't work very well for me and ended up sanding it off.
DB says there should be no problem though just the neck finish dries a bit harder.
Those scratches should come out if you polish with micromesh pads, cut and polish then maguires Scratch X
-
-
Hi Adam. I've just finished a kit using dingotone which I applied starting late December and pretty much carried the process throught out summer in QLD. It's been sitting around 30 degrees average for a lot of that time which made the DT remain tacky but I just ensured a minimum of at least 7 days between every coat. Did 3 stain coats, 3 intensifier and 3 finish coats with about 15 days drying after final coat. As the guys said I changed from steelwool to wet/dry (except for a super light rub prior to waxing the body). I did get the 'blister' 'orange skin' effect in the process but the end result was smooth and worth the effort.
-
Took about 10 weeks of staining all up
-
I'm having great results using the neck finishing coats on the body - but I'm in Perth and have had some nice windows of low humidity. I have also tried to leave 5 days between this coats and avoided applying when humidity greater than 50%. I do find it hard to be patient and wait though -I'm currently in that 21 day window before final cut and polish.