Hey all, I'm building a TL 1TB...first build...
the schematic I have shows I need to run a ground to bridge, on another builder's thread he had a hole that was drilled from the control cavity to the hole for the right (as you look at it) saddle support where the grounding wire was to go.
I don't have a hole drilled from the control cavity or from the bridge humbucker cavity...
I was an electrician in the Navy about 30 years ago and wasn't a good one at that, but I can solder and read a schematic lol
Any suggestions on where to run the ground to or how to do it without drilling or having exposed wires?
Thanks.